Lane Closures: Week of September 17, 2007

Jump To: I-495 | I-395 | Local Closures

Page Last Revised: 9/14/2007 10:04:14 AM

Springfield Interchange

All Lanes are open during rush hours. Expect lane closures between 9 a.m. and 3 p.m., at night and on weekends.

Learn more about General Lane Closure Guidelines

This page is updated frequently to bring you the latest information on lane closures and detours for the Springfield Interchange. Recently updated lane closures have been marked in RED.

I–495 Lane Closures

I–495 East (Outer Loop toward Wilson Bridge)

When: Sat, Sept. 15, 6:00 a.m. to 6:00 p.m.
What: Shoulder closure.
Where: I-95 South between I-495 and Commerce Street Bridge.
Why: Repair drainage troughs.
Map: Marker # 1
 
When: Mon. through Thurs, Sept 17-20, 6:00 a.m. to 6:00 p.m., and Fri, Sept 21, 6:00 a.m. to 6:00 p.m.
What: Shoulder closures on both sides of road and single lane closure.
Where: I-95 South, between Beltway and Commerce Street Bridge.
Why: Repair drainage troughs.
Map: Marker # 1
 
When: Mon. through Thurs, Sept. 17-20, 9:30 a.m. to 3:30 p.m.
What: Single lane closure.
Where: I-95 South between Beltway, I-495 and Commerce Street Bridge.
Why: Bridge inspection.
Map: Marker # 1

I–495 West (Inner Loop toward Tysons Corner)

No closures at this time.

Back To Top

I–395 Lane Closures

I–395 South

When: Mon. through Thurs, Sept 10-13, 5:00 a.m. to 6:00 p.m., and Fri, Sept 14, 5:00 a.m. to 5:00 p.m.
What: Shoulder closures on both sides of road.
Where: I-395 South, between Beltway and Commerce Street Bridge.
Why: Work on drainage troughs.
Map: Marker # 4

I–395 North

When: Mon. through Thurs, Sept.17-20, 9:30 a.m. to 5:00 p.m.
What: Right shoulder closure.
Where: I-95 North between I-395 North split and 1-495 East merge.
Why: Sound barrier wall installation.
Map: Marker # 5

HOV

No closures at this time.

Back To Top

Local Lane Closures

Rt. 644 Lane Closures

No closures at this time.

Old Keene Mill Road

No closures at this time.

Back To Top