Virginia.gov
Skip to Content | Online Services | Commonwealth Sites | Help | Governor

Virginia Department of Transportation: Springfield Intechange Improvement Project

Contact Us |

  • Home »
  • Photo Gallery »
  • June 2004
  • Commuter Solutions
  • Project Benefits
  • Project Background
  • Safety Tips
  • Photo Gallery
  • News Releases
  • Contact Us

June 2004

June 2004

With the opening of the new bridge from the Capital Beltway Inner Loop to I-95 South in May and the addition of a second ramp lane from the Outer Loop to I-95 South traffic has been much quicker and smoother through the interchange area.

Aerial photo of the new bridge from the Capital Beltway Inner Loop to I-95 South (towards the left).

June 2004

Aerial photo of the new bridge from the approach on the Inner Loop to I-95 South (towards the right).

June 2004

Aerial photo of the new bridge from the Capital Beltway Inner Loop to I-95 South (looking north from I-95 to I-395).

June 2004

Photo looking at the 5 afternoon south traffic movements from left to right: Outer Loop to I-95S, Inner Loop to Springfield/Franconia, I-395 to I-95S, the new Inner Loop bridge to I-95S and the HOV lanes.

© 2006 Virginia Department of Transportation | Privacy Statement | WAI Compliance | Freedom of Information Act | Web Policy
This Web site includes hyperlinks to sites neither controlled nor sponsored by VDOT or the Commonwealth of Virginia. Links may open in a new window.